Custom-engineered by Cypress
let’s build it.
Bring us the application, incompatibility, or product idea. Our team can shape the requirements, engineer the firmware and hardware, and deliver a solution built for the job.
CX
Built around your application
Your requirements.
One custom solution.
Data conversion
Wiegand + OSDP
Firmware
Hardware
One clear path
From your idea to a working solution.
Start with what you know. We’ll help turn the missing details into a practical scope, then manage the engineering work through delivery.

STEP 01
Your idea
Tell us the challenge, the equipment involved, your deadline, and what success needs to look like.
STEP 02
Plan together
We clarify interfaces, quantities, samples, specifications, project terms, and the fastest realistic path.
STEP 03
Engineer and build
Cypress develops the required firmware, circuit board, enclosure, or data logic and verifies the result.
STEP 04
Deliver your solution
Receive a purpose-built product ready to install, solve the application, and support your customer.
Start with the closest fit
What are you trying to build?
Choose a project type to see the information that helps us scope it. You do not need every answer before contacting us; this is a practical head start, not a gate.
Data converterWiegand splitterOSDP splitterApplication firmwareHardware + firmware
Typical lead time: 2–3 weeks
Custom data converter
For a conversion or protocol bridge that a standard Cypress product does not cover.
01
What is the project deadline?
02
How many units are needed?
03
Which devices must the converter interface with? Include model numbers.
04
For each device, what data interface and protocol or encoding scheme is used?
05
Describe the logical data conversion the custom converter needs to perform.
06
Is sample hardware or representative data available?
Interfaces
Protocol logic
Sample data
Typical lead time: 2 weeks
Intelligent Wiegand data splitter
For routing credentials between access control systems with application-specific format logic.
01
What is the project deadline?
02
How many units are needed?
03
What credential types are used with each access control system?
Tell us whether credentials share the same Wiegand format. If not, include each bit length. If they do, provide the specific formats and facility-code values used by each system.
Credential formats
Facility codes
Routing rules
Coming soon · typical lead time: 2 weeks
Custom OSDP data splitter
For projects that require an application-specific OSDP reader-to-controller splitting path.
01
What is the project deadline?
02
How many units are needed?
03
Which reader and access controller model numbers will be used with the splitter?
Reader model
Controller model
OSDP topology
Lead time depends on specifications
Custom application firmware
For firmware development or modification on documented product hardware.
01
What is the project deadline?
02
Provide a firmware specification document.
03
Provide the product hardware documentation.
04
Project terms and an ownership agreement must be in place before work begins.
05
Can sample hardware be provided? It is strongly preferred when possible.
06
Is a nondisclosure agreement needed?
07
Contact Cypress Sales for an initial consultation about the project details and documents.
Firmware specification
Hardware documents
NDA if needed
Lead time depends on specifications
Custom product: hardware and firmware
For a complete purpose-built product that combines electronics, firmware, and physical integration.
01
What is the project deadline?
02
Provide a product specification document.
03
Contact Cypress Sales for an initial consultation about the project details and documents.
04
What other hardware must the custom product interface with? Include model numbers.
05
Can sample hardware be provided? It is strongly preferred when possible.
06
Is a nondisclosure agreement needed?
07
Project terms and an ownership agreement must be in place before work begins.
Product specification
Interfacing hardware
Ownership terms
Your brief can start simple
Bring us the challenge.
Share the application, deadline, quantity, and any model numbers or sample hardware you already have. Our team will tell you what comes next.
Simple custom converters and splitters may ship within two to three weeks after the project details are finalized and the order is received. Complex projects are scheduled to match the approved scope.
